Leadership and expertise to establish the initial Concept including:
- Space Planing of the Equipment and Angle View
- Theatres Layouts
- Control Rooms Layouts
- Equipment List and Preliminary Budget
- Rooms Functionality and Technical Requirement Document
- Audio-Visual and Control Systems
- Cinematograhic Systems
- Perforated Screen and Masking Systems
- Lighting Systems
- Support for the Architect and the Electrical Engineer.
Team Leader and engineering expertise for the design of:
- Five (5) Dedicated Year-round Cinemas
- One Screening Room
- Master Control
- CER (Central Equipment Room)
- Gallery Space for Permanent Collections and Touring Exhibits and Expanded Film Reference
Library
- Multiple Education Facilities
- Permanent Box Office
- Retail Space
- Loading Dock
- Roof Terrace
The Engineering included:
- AV Electrical Requirements Drawings Set including Power and Heat Loads, Conduits,
Cable Trays, Cabling and Electrical Boxes Schedule.
- Space Planning
- Conceptual Connection Drawings for Audio, Video, Control, Paging, Lighting, Video
and 35mm Projectors, Sound Systems, T-Screen Control System
- RFQ(s) Documents for Audio-Visual Systems, Cinematographic Systems, Lighting and
Screen & Masking
- Equipment List and Budget
- Evaluation Matrix for RFQ(s) Responses
- Recommended Bid Winner.